Verify mill test reports against purchase orders

Compare each mill test report to the purchase order: certificate type, heat number, chemistry, and mechanical results. A quality person dispositions every failure and raises any nonconformance.

MTR check: PO-2291, heat H-00417 (sample)
Hold for quality
PO against certificate
CheckCert showsResult
Cert typeEN 10204 2.2Wrong type
Heat numberH-00417Match
Carbon max0.18Within
Yield min33 ksiBelow
Melt sourceNot statedPerson reviews

Limits are sample PO values, not from a standard.

Disposition
Vendor
Test Vendor 3
Lot
LOT-0417
Reviewer
Pending quality review
NCR
Raised by a person, if needed
Sample data. Every name and number here is made up.

How it runs.

Paper certs stack up at receiving. The wrong certificate type, or a heat number that does not match the tag, can stay hidden until a customer audit.

  1. MTR and PO

    Scanned certificate, the PO, and the heat or lot tag.

    Your data
  2. Compare to PO

    Certificate type, heat, chemistry, mechanicals, and PO clauses compared.

    Automated
  3. Quality person decides

    Dispositions every failure and raises any nonconformance report.

    A person
  4. Cert filed to lot

    Certificate and decision stored against the heat and lot.

    Automated

EN 10204 documents / ERP or QMS / Purchase orders / Scanned MTRs / DFARS 252.225-7009

The rules and limits.

Type 2.2
EN 10204 type 2.2 is a test report from non-specific inspection. The products tested are not necessarily the products actually supplied.
Types 3.1 and 3.2
Types 3.1 and 3.2 rest on specific inspection of the products supplied or their test units. A 3.2 adds the purchaser's representative or a designated inspector.
Heat traceability
A heat or cast number can trace material back to its ladle analysis. We compare the number on the certificate to your tag.
Specialty metals
DFARS 252.225-7009 restricts where covered specialty metals are melted or produced, with exceptions. The clause names no mill cert, so your customer's terms set the proof.
Limits come from you
We do not hold ASTM or EN tables. Chemistry and mechanical limits come from your PO or the specification you provide.

What a person does.

  • A quality person dispositions every failure.
  • A person raises any nonconformance report.
  • A person decides what DFARS melt-source proof is enough.
  • A person signs any certificate of conformance to your customer.

Where we stand: we have not shipped this for a metals buyer. It uses the same pattern as our document extraction and review-queue work.

Common questions.

Is a 2.2 test report the same as a 3.1 certificate?+

No. A 2.2 reports results from non-specific inspection, and the products tested may not be those supplied. A 3.1 rests on specific inspection. If your PO requires 3.1, a 2.2 is flagged.

Does this make us DFARS compliant?+

No. It only compares documents. Whether material meets DFARS 252.225-7009, or an exception applies, is for your quality and contracts people, and counsel where needed.

Do you check against ASTM specifications?+

Only through limits you give us. ASTM standards are sold separately and we do not claim to hold them. Limits come from your PO or the specification you provide.

Sources

General information, not legal, tax, or compliance advice. Rules change; confirm against the current source and your own advisers.

Bring us your version of this.

Intro calls are 30 minutes, free, and useful even if we never work together. We'll be honest about whether this is the right fit for your operations team.